Local contractor Baker Electric installed the machines and removed, replaced and connected medium voltage cables at the cruise docks. In the event you have “Shipped” an Order in ShipStation (created a label or used ‘Mark as shipped’), however the order will not be staying updated to Finished, check to https://www.facebook.com/Shipvista/photos/pb.100063583720784.-2207520000./1032849467502331/?type=3