The soil investigation report handed on the structural engineer for that design of pile foundation goal really should comprise the embedment duration with the piles, the advised sizes with the pile, the Secure Functioning load of each pile size, along with other info that may be needed for the structural https://hilaryk801eed4.wikicommunications.com/user