Initially, the Jai Hind metro station was planned to generally be elevated. Even so, the AAI objected the elevated stretch up towards the airport may well pose a danger to aircraft, And so the route was further more reworked along with the station was shifted underground, a hundred and fifty m https://manueldsckt.affiliatblogger.com/84260566/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf